Corridor · Gordie Howe Bridge
The corridor shifted in 2026.
The Gordie Howe International Bridge opened to traffic on July 27, 2026. Six lanes. Direct freeway-to-freeway. A new crossing for US–Canada trade between Windsor and Detroit.
Project Scale
July 2026
Opened to traffic
6
Lanes, freeway to freeway
2.5 km
Total bridge length
What It Changes
New capacity, new scrutiny.
New crossings draw scrutiny. When traffic patterns shift, documentation gaps that went unnoticed on a familiar route tend to surface — and customs authorities on both sides apply the same standards at every port of entry.
Importers already running pre-border validation move through unchanged. Importers still relying on filing-day document chasing find out quickly what the new baseline looks like.